Sluice entry Different levels of identification are applied to each visitor of the datacenter Date/Time: Thu 31 Aug 2006 04:11:01 PM CEST Different levels of identification are applied to each visitor of the datacenter with physical access control. one person passes at a time to enter the datacenter
UPS room - power cabinets Electric circuit racks providing power A and B circuits with UPS power in case of power cut Date/Time: Thu 31 Aug 2006 02:30:28 PM CEST Electric circuit racks providing power A and B circuits with UPS power in case of power cut
UPS room - main control panel UPS power synchronisation, synchronising power from UPS batteries and diesel generators Date/Time: Thu 31 Aug 2006 02:30:47 PM CEST UPS power synchronisation, synchronising power from UPS batteries and diesel generators
Battery room Batteries on shelf are connected to the UPS room. Date/Time: Thu 31 Aug 2006 02:45:25 PM CEST Batteries on shelf are connected to the UPS controlling unit. They assure the immediate power supply in case of a network power cut. After a while the diesel generators will be ready to take over the power production for maximum independancy.
Battery room Date/Time: Thu 31 Aug 2006 02:48:43 PM CEST
Battery room 48V and 220V battery shelfs Date/Time: Thu 31 Aug 2006 02:49:21 PM CEST
Detail on 48V UPS batteries Date/Time: Thu 31 Aug 2006 02:52:03 PM CEST
Diesel power generator Date/Time: Thu 31 Aug 2006 02:53:40 PM CEST
Generator power distribution panel Power distribution panel managing emergency A and B power circuits Date/Time: Thu 31 Aug 2006 02:55:01 PM CEST Power distribution panel managing emergency A and B power circuits
Diesel power generators for maximum power independancy. Date/Time: Thu 31 Aug 2006 02:54:33 PM CEST
Redundant emergency power production with two generators If one generator fails, one still remains working Date/Time: Thu 31 Aug 2006 02:57:01 PM CEST
Argon fire extinguish unit Argon pipe circuits are connected to colocation rooms via fire alarm Date/Time: Thu 31 Aug 2006 02:37:11 PM CEST
Argon fire extinguish unit view on rows of gas-cylinders containing compressed Argon Date/Time: Thu 31 Aug 2006 02:38:43 PM CEST
Warning sign colocation room entry During a fire alarm colocation room will be flooded with Argon gas. Date/Time: Thu 31 Aug 2006 04:09:07 PM CEST
Colocation room is ESD protected area Persons entering the colocation room have to wear special anti-static overshoes. They also prevent dirt from entering the server room. Date/Time: Thu 31 Aug 2006 04:05:57 PM CEST
Fiber room Date/Time: Thu 31 Aug 2006 03:03:12 PM CEST
Patch panel - coax Date/Time: Thu 31 Aug 2006 03:03:23 PM CEST
Fiber routing Date/Time: Thu 31 Aug 2006 03:05:43 PM CEST
Fiber routing - converging SDH cityrings Date/Time: Thu 31 Aug 2006 03:06:36 PM CEST
Fibre patch rack - detail Date/Time: Thu 31 Aug 2006 03:08:43 PM CEST
Fibre patch rack - detail Date/Time: Thu 31 Aug 2006 03:09:02 PM CEST
Patch panels coax Date/Time: Thu 31 Aug 2006 03:12:31 PM CEST
Yellow ceiling fiber trays Special trays seperating fragile fiber from other cabling and protect fiber from overbending on angles Date/Time: Thu 31 Aug 2006 03:13:18 PM CEST Special trays seperating fragile fiber from other cabling and protect fiber from overbending on angles
Redundant fiber entry Redundant cityrings, entry ring east Date/Time: Thu 31 Aug 2006 03:14:46 PM CEST Redundant cityrings, entry ring east
Redundant IP core router Date/Time: Thu 31 Aug 2006 03:21:52 PM CEST
Colocation racks 48U heigth and 1000mm depth for very long servers and enough space for organising cabling Date/Time: Thu 31 Aug 2006 03:40:11 PM CEST 48U heigth and 1000mm depth for very long servers and enough space for organising cabling
Colocation racks Date/Time: Thu 31 Aug 2006 03:43:05 PM CEST
Rack door Providing access security and at the same time good airflow Date/Time: Thu 31 Aug 2006 03:30:50 PM CEST
Colocation rack Date/Time: Thu 31 Aug 2006 03:26:29 PM CEST
Colocation rack - detail Date/Time: Thu 31 Aug 2006 03:27:54 PM CEST
Gigabit switch with patch cables - detail Date/Time: Thu 31 Aug 2006 03:33:26 PM CEST
E-powerswitch for remote power cycling of server units Remote power cycling of server units. Each server's power cord is connected to a dedicated power outlet of the E-powerswitch Date/Time: Thu 31 Aug 2006 03:36:26 PM CEST This units permits remote power cycling of server units. Each server's power cord is connected to a dedicated power outlet of the E-powerswitch
E-powerswitch Web interface of E-powerswitch, each power socket is associated to a server device. Every connected device can be individually power cycled via the web interface thus reducing downtimes. Date: 09/18/2006 Web interface of E-powerswitch, each power socket is associated to a server device. Every connected device can be individually power cycled via the web interface thus reducing downtimes.
E-powerswitch and server rear Detail of 1U servers connected to E-powerswitch Date/Time: Thu 31 Aug 2006 03:36:53 PM CEST Detail of 1U servers connected to E-powerswitch
Structured colocation server cabling Date/Time: Thu 31 Aug 2006 03:37:24 PM CEST
Gigabit switch Date/Time: Thu 31 Aug 2006 03:51:56 PM CEST
Console Port Management SSH server with redirection to console on serial ports of servers. This device even permits to access the server's BIOS from a distance! Date/Time: Thu 31 Aug 2006 03:49:52 PM CEST
Air conditionning of colocation room HVAC display showing the current temperature in the colocation room. Recommended average temperature should range between 18-25°C. Date/Time: Thu 31 Aug 2006 03:38:41 PM CEST HVAC display showing the current temperature in the colocation room. The fresh air is blown into the technical floor and enters the racks at the bottom. Recommended average temperature should range between 18-25°C.
Technical floor containing redundant 48V and 230V power A and B circuits, coax and Ethernet cable trays Date/Time: Thu 31 Aug 2006 03:41:41 PM CEST
Colocation rack with view on top ventilator The fresh air comes in from the technical floor and leaves the rack through the top ventilation Date/Time: Thu 31 Aug 2006 03:47:42 PM CEST The fresh air comes in from the technical floor and leaves the rack through the top ventilation, providing all equipment with constant temperature.
server rack airflow - thermal view Thermal picture showing cold air coming in from the technical floor and hot air leaving the rack from the top ventilation Date: 09/09/2006 Thermal picture showing cold air coming in from the technical floor and hot air leaving the rack from the top ventilation
Production loadbalancing setup with 9 servers Front view of 1U servers with hot-swap hard disk bays. These servers are equiped with SATA2 RAID10 devices. Date/Time: Thu 31 Aug 2006 04:03:25 PM CEST Front view of 1U servers with hot-swap hard disk bays. These servers are equiped with SATA2 RAID10 devices. Two frontend servers are configured with Ultramonkey's ipvsadm and send the incoming requests persistantly to the servers in the load balanced pool : http://www.ultramonkey.org/papers/lvs_tutorial/html/
Colocation racks Date/Time: Thu 31 Aug 2006 03:57:29 PM CEST
Detail servers Date/Time: Thu 31 Aug 2006 03:51:30 PM CEST
Amperemeters controlling total intake per rack Date/Time: Thu 31 Aug 2006 03:55:51 PM CEST
[-]